Upcoming Developments
New housing developments on the drawing board or under construction
The first site is situated next to the Birmingham Loop Brindley Canal and is adjacent to the Thomas Telford designed dam to create the Edgbaston Reservoir which tops up the canal system. The entire site was covered by a factory complex created in the 1930s but earlier factory buildings on the site go back to the late 17th Century.
The apartments are proposed over a 2 storey underground car park and the design addresses two main streets and the canal.
Outline Planning consent has been obtained for over 260 apartments which either overlook the canal or a large landscaped central area. Also proposed are roof gardens to most of the development with some roofs covered in solar panels. Detail Application Design is now underway.
The second site was a large railway siding with buildings and a factory which operated from Victorian times until the late 1980s. The site was proposed for factory development and after following completion of the first phase it was abandoned as the scheme had not been successful. Outline consent has now been obtained for over 300 apartments and a large landscaped area for the use of the residents.
New housing developments on the drawing board or under construction
A development of 8 houses on a site at the edge of the village and on land adjoining the historic Battlefield of Edge Hill
A small development of 5 luxury detached houses located in Harborne in Harborne Old Village Conservation Area
For all enquiries regarding any of the services we can offer or if you would like to discuss a project, please contact us
With over 60 years’ combined experience in architecture in the UK, Europe, Los Angeles, Dubai and the Caribbean, Mike Lapworth Architects are able to handle many kinds of projects in the built environment.
Our site uses cookies to give you the best experience. Please visit our Privacy Policy here.